Play/Export Storyboard
Storyboards can be started from the Maintain Storyboard menu:
To play a particular Storyboard, select "Play" from the panel above the report images
It is also possible to Play, Edit (properties) or Delete a particular report from a Storyboard : These options are available in the panel below each specific report within the Storyboard.
Besides playing a Storyboard, you can use a number of additional options: e.g. Edit, Delete, Share , etc. (see all available options on the screen above, in the panel above the report images).
POV Fixes
When playing a Storyboard a pop-up window will open with an option to fix the Point of View before using a Storyboard. Fixing the POV allows the user to set a default POV for any (combination of) dimension(s). Check the box next to the Dimension you would like to fix and select the required member from the Pick List or use the member search functionality.
Where used?
The POV Can be fixed when you:
Example Usage
- Printout a management book for a single currency
- Share a Storyboard for one single operational entity using the /wiki/spaces/CXO/pages/2806777048
- Run a Storyboard for a new period
Navigation
You can navigate to reports by using the Storyboard's media player as shown below.
For instance, to deliver a full story during a Board or Controller meeting, the Storyboard guides the presenter through the presentation with the media player.
Another option to navigate to reports inside the Storyboard is by selecting a report from the Report title drop-down menu.